Global Animal Health Customer Cleanroom Project






Project Overview
EMT completed installation of approximately 2800 sqm cleanroom for global animal health customer at existing facility in Tullamore, Ireland, including ISO 7 and ISO 8 clean areas.
Challenges & Pain Points
- Need to build on existing facility
- Need to meet ISO 7/8 standards
- Need biosafety design
- Need Class A fire-rated panels
Our Solution
EMT technical team provided complete cleanroom solution including wall and ceiling systems, doors and windows, FFU fan filter units, pass boxes, air showers and laminar flow hoods. Using rock wool and magnesium oxide sandwich panels for Class A fire rating, HEPA filters for air cleanliness.
Project Results
Related Products
View All
Rock Wool Sandwich Panel
View Details

Silica Sandwich Panel
View Details

True Gold Sandwich Panel
View Details

PU Sandwich Panel
View Details

EPS Sandwich Panel
View Details

Hollow Magnesium Oxide Panel
View Details

Magnesium Oxysulfate Panel
View Details

Magnesium Rock Wool Panel
View Details

Handmade Rock Wool Panel
View Details

Handmade Magnesium Oxysulfate Panel
View Details

Handmade Hollow Glass Magnesium Panel
View Details

Handmade Glass Magnesium Rock Wool Panel
View Details

Handmade Gypsum Rock Wool Panel
View Details

Handmade Blind Panel
View Details

Handmade Aluminum Honeycomb Panel
View Details

Steel Clean Door
View Details

Steel Medical Door
View Details

Stainless Steel Door
View Details

Steel Safety Door
View Details

Steel Return Air Door
View Details

Steel Primary-Secondary Door
View Details

Anti-Collision Door
View Details

Quick Rolling Door
View Details

Hardware Accessories
View Details

Aluminum Accessories
View Details

Cleanroom Turnkey Installation
View Details

Alexander Petrov
Chief Project Engineer
15 Years Experience
200+ Projects Led
Certified Engineer
Want to replicate this success?
Consult the Project Lead directly about costs, timeline, or site visits.
Your inquiry is sent directly to the project engineering team.