Vertical Guardrail Coating Line Project

Project Overview
EMT designed and built a vertical guardrail coating line for a large Russian metal structure enterprise. The customer is a leading metal structure manufacturer. Traditional horizontal lines occupy large space with limited capacity. EMT applied innovative vertical technology - guardrails hung vertically, saving about 60% floor space while double-sided coating doubles capacity.
Challenges & Pain Points
- Traditional horizontal lines occupy large space
- Limited capacity
- Need high automation
- Need to meet environmental requirements
Our Solution
EMT technical team applied innovative vertical technology with guardrails hung vertically, equipped with vertical conveyor system, pass-through shot blasting machine, 12 automatic spray guns for double-sided coating, and vertical gas drying oven. Floor space only 40% of traditional line, capacity over 3000 panels/day.
Project Results
Related Products
View All
Alexander Petrov
Chief Project Engineer
15 Years Experience
200+ Projects Led
Certified Engineer
Want to replicate this success?
Consult the Project Lead directly about costs, timeline, or site visits.
Your inquiry is sent directly to the project engineering team.